Aboriginal Gathering Place & Quarry Hills - Offentlig prosjektsted
-
21st november 2024, "Snake Alert" Document
urpose:
Tillegg :
The document provides guidance for handling snake sightings and preventing risks during the snake season, particularly around the Aboriginal Gathering Place and Quarry Hills.
Key Points:
1. Prevention and Protection:
• Eliminate food sources (e.g., mice and rats) to discourage snakes.
• Remove rubbish and materials that can offer shelter.
• Raise awareness about increased snake risks during the season.
• Use personal protective equipment (gloves, long sleeves, pants, safety footwear).
• Stay vigilant; snakes are not actively seeking humans but may hide nearby.
2. Actions if a Snake is Observed:
• Stay calm and note the snake's location.
• Cease all work in the area.
• Do not approach, provoke, or attack the snake.
• Notify the 2Construct Site Manager immediately.
3. First Aid for Snake Bites:
• Immobilize the affected limb as with a fracture and apply a firm bandage over the bite.
• Keep the victim calm and the limb still.
• Call for emergency transportation to medical care.
• Do not:
○ Cut or excite the bite area.
○ Use an arterial tourniquet.
○ Wash the bitten area.
Contact:
Report incidents to the 2Construct Site Manager for assistance.
Snake Alert.pdf
-
20th september 2024, Live in ground power mark up
Dear Team,
Tillegg :
Please be informed that the attached live in ground power markup is now accessible on the Hammer Tech homepage. Kindly refer to this document for any in-ground digging activities moving forward. Additionally, a hard copy is available for viewing at the site office.
Thank you for your attention to this matter.
live power mark up.pdf
-
13th september 2024, The Certificate of Electrical Safety for electrical installation work EIC-14023753 undertaken at 105 HUNTERS RD SOUTH MORANG VIC 3752 is now available. Please see COES P1011108510 attached for your records.
The Certificate of Electrical Safety for electrical installation work EIC-14023753 undertaken at 105 HUNTERS RD SOUTH MORANG VIC 3752 is now available. Please see COES P1011108510 attached for your records.
Tillegg :
CES13.9.24.pdf
Vær på anleggsted
Sist oppdatert kl.: 12:21
Temperatur: 22C (App 21C)
Vindfart: 7KMH
Maks. Vind: 11KMH @10:21
Regn side 09.00: 0,0mm
Min. temperatur: 9C @06:59
Maks. temperatur: 23C @12:19
Vindkast: 11KMH
Maks. vindkast: 15KMH @10:21
Observasjonssted - Viewbank, VICTORIA
Tidssone - austaustralsk standardtid
Værmelding – måndag, 12 januar
Partly cloudy.
Min.: 16C Maks.: 24C
Sjanse for regn: 20%
Sted for værmelding – Melbourne, VICTORIA
Tidssone - austaustralsk standardtid
I morgen - tysdag, 13 januar
Possible shower.
Min.: 16C Maks.: 25C
Sjanse for regn: 40%
Forventet nedbør: 0 til 2mm
Vet du om PVU-kravene for dette anlegget?
Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.
Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.
Fullfør nettstedsregistreringen din online når det passer deg og spar tid.
Vet du om PVU-kravene for dette anlegget?
Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.
Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.
Fullfør nettstedsregistreringen din online når det passer deg og spar tid.