Aboriginal Gathering Place & Quarry Hills - 公共プロジェクト現場
-
21st 11月 2024, "Snake Alert" Document
urpose:
添付ファイル :
The document provides guidance for handling snake sightings and preventing risks during the snake season, particularly around the Aboriginal Gathering Place and Quarry Hills.
Key Points:
1. Prevention and Protection:
• Eliminate food sources (e.g., mice and rats) to discourage snakes.
• Remove rubbish and materials that can offer shelter.
• Raise awareness about increased snake risks during the season.
• Use personal protective equipment (gloves, long sleeves, pants, safety footwear).
• Stay vigilant; snakes are not actively seeking humans but may hide nearby.
2. Actions if a Snake is Observed:
• Stay calm and note the snake's location.
• Cease all work in the area.
• Do not approach, provoke, or attack the snake.
• Notify the 2Construct Site Manager immediately.
3. First Aid for Snake Bites:
• Immobilize the affected limb as with a fracture and apply a firm bandage over the bite.
• Keep the victim calm and the limb still.
• Call for emergency transportation to medical care.
• Do not:
○ Cut or excite the bite area.
○ Use an arterial tourniquet.
○ Wash the bitten area.
Contact:
Report incidents to the 2Construct Site Manager for assistance.
Snake Alert.pdf
-
20th 9月 2024, Live in ground power mark up
Dear Team,
添付ファイル :
Please be informed that the attached live in ground power markup is now accessible on the Hammer Tech homepage. Kindly refer to this document for any in-ground digging activities moving forward. Additionally, a hard copy is available for viewing at the site office.
Thank you for your attention to this matter.
live power mark up.pdf
-
13th 9月 2024, The Certificate of Electrical Safety for electrical installation work EIC-14023753 undertaken at 105 HUNTERS RD SOUTH MORANG VIC 3752 is now available. Please see COES P1011108510 attached for your records.
The Certificate of Electrical Safety for electrical installation work EIC-14023753 undertaken at 105 HUNTERS RD SOUTH MORANG VIC 3752 is now available. Please see COES P1011108510 attached for your records.
添付ファイル :
CES13.9.24.pdf
現在の現場の天気
最終更新日時: 12:21
温度: 22C (アプリ 21C)
風速: 7KMH
最大風速: 11KMH @10:21
午前9時からの雨: 0.0mm
最低気温: 9C @6:59
最高気温: 23C @12:19
突風: 11KMH
最大突風: 15KMH @10:21
観察場所 - Viewbank, VICTORIA
タイムゾーン - オーストラリア東部標準時
予測 - 月曜日, 12 1月
Partly cloudy.
分: 16C マックス: 24C
降雨の可能性: 20%パーセント
予測場所 - Melbourne, VICTORIA
タイムゾーン - オーストラリア東部標準時
明日 - 火曜日, 13 1月
Possible shower.
分: 16C マックス: 25C
降雨の可能性: 40%パーセント
予想降雨量: 0 に 2mm