Aboriginal Gathering Place & Quarry Hills
Nedávné bulletiny
  • 21st listopadu 2024, "Snake Alert" Document

    urpose:
    The document provides guidance for handling snake sightings and preventing risks during the snake season, particularly around the Aboriginal Gathering Place and Quarry Hills.

    Key Points:
    1. Prevention and Protection:
    • Eliminate food sources (e.g., mice and rats) to discourage snakes.
    • Remove rubbish and materials that can offer shelter.
    • Raise awareness about increased snake risks during the season.
    • Use personal protective equipment (gloves, long sleeves, pants, safety footwear).
    • Stay vigilant; snakes are not actively seeking humans but may hide nearby.

    2. Actions if a Snake is Observed:
    • Stay calm and note the snake's location.
    • Cease all work in the area.
    • Do not approach, provoke, or attack the snake.
    • Notify the 2Construct Site Manager immediately.

    3. First Aid for Snake Bites:
    • Immobilize the affected limb as with a fracture and apply a firm bandage over the bite.
    • Keep the victim calm and the limb still.
    • Call for emergency transportation to medical care.
    • Do not:
    ○ Cut or excite the bite area.
    ○ Use an arterial tourniquet.
    ○ Wash the bitten area.

    Contact:
    Report incidents to the 2Construct Site Manager for assistance.

    Přílohy :
    Snake Alert.pdf
  • 20th září 2024, Live in ground power mark up

    Dear Team,

    Please be informed that the attached live in ground power markup is now accessible on the Hammer Tech homepage. Kindly refer to this document for any in-ground digging activities moving forward. Additionally, a hard copy is available for viewing at the site office.

    Thank you for your attention to this matter.

    Přílohy :
    live power mark up.pdf
  • 13th září 2024, The Certificate of Electrical Safety for electrical installation work EIC-14023753 undertaken at 105 HUNTERS RD SOUTH MORANG VIC 3752 is now available. Please see COES P1011108510 attached for your records.

    The Certificate of Electrical Safety for electrical installation work EIC-14023753 undertaken at 105 HUNTERS RD SOUTH MORANG VIC 3752 is now available. Please see COES P1011108510 attached for your records.

    Přílohy :
    CES13.9.24.pdf
Předpověď počasí pro stavbu
Aktuální počasí na pracovišti

Naposledy aktualizováno v: 12:21
Teplota: 22C (Aplikace 21C)
Rychlost větru: 7KMH
Max. vítr: 11KMH @10:21
Déšť od 9 ráno: 0,0mm
Min. teplota: 9C @6:59
Max. teplota: 23C @12:19
Náraz větru: 11KMH
Max náraz větru: 15KMH @10:21


Pozorování vycházející z - Bureau of Meteorology
Místo pozorování - Viewbank, VICTORIA
Časové pásmo - východoaustralský standardní čas
Předpověď – pondělí, 12 ledna

Partly cloudy.
Min: 16C Max: 24C
Možnost deště: 20%


Předpověď pochází z – Bureau of Meteorology
Místo předpovědi – Melbourne, VICTORIA
Časové pásmo - východoaustralský standardní čas
Zítra - úterý, 13 ledna

Possible shower.
Min: 16C Max: 25C
Možnost deště: 40%
Očekávaný déšť: 0 k 2mm


Důležité dokumenty pracoviště
Novinka na pracovišti?

Znáte požadavky na OOPP pro toto pracoviště?

Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.

Zobrazit požadavky na OOPP ke stavbě

Po příjezdu na místo můžete začít pracovat dříve.

Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.

Začít registraci

Novinka na pracovišti?

Znáte požadavky na OOPP pro toto pracoviště?

Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.

Zobrazit požadavky na OOPP ke stavbě

Novinka na pracovišti?

Po příjezdu na místo můžete začít pracovat dříve.

Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.

Začít registraci

;