Aboriginal Gathering Place & Quarry Hills - Sitio de proyecto público
-
21st noviembre 2024, "Snake Alert" Document
urpose:
Archivos adjuntos :
The document provides guidance for handling snake sightings and preventing risks during the snake season, particularly around the Aboriginal Gathering Place and Quarry Hills.
Key Points:
1. Prevention and Protection:
• Eliminate food sources (e.g., mice and rats) to discourage snakes.
• Remove rubbish and materials that can offer shelter.
• Raise awareness about increased snake risks during the season.
• Use personal protective equipment (gloves, long sleeves, pants, safety footwear).
• Stay vigilant; snakes are not actively seeking humans but may hide nearby.
2. Actions if a Snake is Observed:
• Stay calm and note the snake's location.
• Cease all work in the area.
• Do not approach, provoke, or attack the snake.
• Notify the 2Construct Site Manager immediately.
3. First Aid for Snake Bites:
• Immobilize the affected limb as with a fracture and apply a firm bandage over the bite.
• Keep the victim calm and the limb still.
• Call for emergency transportation to medical care.
• Do not:
○ Cut or excite the bite area.
○ Use an arterial tourniquet.
○ Wash the bitten area.
Contact:
Report incidents to the 2Construct Site Manager for assistance.
Snake Alert.pdf
-
20th septiembre 2024, Live in ground power mark up
Dear Team,
Archivos adjuntos :
Please be informed that the attached live in ground power markup is now accessible on the Hammer Tech homepage. Kindly refer to this document for any in-ground digging activities moving forward. Additionally, a hard copy is available for viewing at the site office.
Thank you for your attention to this matter.
live power mark up.pdf
-
13th septiembre 2024, The Certificate of Electrical Safety for electrical installation work EIC-14023753 undertaken at 105 HUNTERS RD SOUTH MORANG VIC 3752 is now available. Please see COES P1011108510 attached for your records.
The Certificate of Electrical Safety for electrical installation work EIC-14023753 undertaken at 105 HUNTERS RD SOUTH MORANG VIC 3752 is now available. Please see COES P1011108510 attached for your records.
Archivos adjuntos :
CES13.9.24.pdf
Tiempo en Obra actual
Última actualización el: 12:21 PM
Temperatura: 22C (Aplicación 21C)
Velocidad del viento: 7MPH
Máx. Viento: 11MPH @10:21 AM
Lluvia desde las 9 a.m.: 0.0mm
Temp mín: 9C @6:59 AM
Temp máx: 23C @12:19 PM
Ráfaga: 11MPH
Ráfagas máx: 15MPH @10:21 AM
Lugar de observación - Viewbank, VICTORIA
Zona horaria - hora estándar de Australia oriental
Pronóstico - lunes, 12 enero
Partly cloudy.
Mín: 16C Máx: 24C
Probabilidad de lluvia: 20%
Lugar de la previsión - Melbourne, VICTORIA
Zona horaria - hora estándar de Australia oriental
Mañana - martes, 13 enero
Possible shower.
Mín: 16C Máx: 25C
Probabilidad de lluvia: 40%
Se esperan precipitaciones: 0 para 2mm
¿Conoce los requisitos de PPE para esta Obra?
Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.
Empiece a trabajar en cuanto llegue a la obra.
Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.
¿Conoce los requisitos de PPE para esta Obra?
Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.
Empiece a trabajar en cuanto llegue a la obra.
Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.